When the U. S. Parks Department needed help with a moisture problem in the White House Visitor’s Center we were asked what could be done.
We worked with a team that included engineers, equipment suppliers and mechanical contractors, to analyze the situation and provide an analysis of what could be done with the air conditioning equipment to provide greater dehumidification capacity and stable occupied comfort levels.
Through the use of the buildings automation system and controllable heat pipes, a cost effective method was found. |
|
|
 |
|